Work included site work and construction of two additions to the existing High School. Classroom addition is wood framed, one story, at 12,363 square feet. Gymnasium/Flat Floor Multi-Purpose space addition are CMU walls at the gym, and two storied steel framed, concrete floor slabs, at multipurpose space. First floor is 36,711 square feet, second floor is 4,905 square feet.