Project consisted of removing existing grass football field, adding rubberized track sports surfacing, long jump pits, shotput pads, goal posts, chain link fencing, and other items. New site work included grading, erosion control, asphalt paving, storm drainage, concrete flatwork, preparation of site for synthetic turf system including new concrete curbs, conduit and electrical installation, stadium handrail installation and repair, protective coatings for handrail and stadium.